Heating/Cooling HVAC

  • HVAC must be designed for the restaurant occupancy with a balanced ventilation system.
     
  • Energy code requires insulation and other energy-saving requirements if the tenant space was not previously heated.
     
  • Combustion air must be designed by a licensed engineer for any fuel-fired equipment such as wood-fire pizza ovens, gas oven/ranges, and gas-fired boilers.

 

We request that contractors schedule a Pre-submittal Meeting prior to submitting building permits. Please call 503.691.3044 with any building questions.