Martinazzi Ave Sewer (Avery St to north of Sagert St)

Martinazzi Avenue is closed from Sagert Street to Avery Street for a few months. The contractor is constructing new sewer line along Martinazzi south of Sagert Street.  Work includes significant pounding noise and vibration in order to safely dig the deep trench needed to get the pipe deep enough for downhill flow.  Most of the work will be in the closed section of Martinazzi and not affect Sagert Street traffic.  Access is maintained for adjacent properties – mostly from the South. 

Boones Ferry Road at Ibach Street (Grahams Ferry Road)

Operation of the traffic signal at the intersection of Boones Ferry Road with Ibach Street is being revised to ‘split-phase’ traffic on Ibach Street so that traffic from each side of Ibach goes separately.  This is for pedestrian safety so we no longer have drivers turning left on a green light across a crosswalk with a ‘walk’ sign.  This change is scheduled Thursday, Oct 24. Traffic will be controlled by flaggers while the change is made. 

Siuslaw Greenway (Boones Ferry Rd to 99th Ave)

Surveyors are working in the Siuslaw Greenway (north of Alsea Street, between Boones Ferry Rd and 99th Ave) to design drainage improvements in the greenway and replacement of deteriorated storm drainage pipes.

Tualatin- Sherwood Rd (from Teton Ave to Sherwood)

Washington County’s contractor is adding travel lanes and pathways along Tualatin-Sherwood Rd from Teton Ave west into Sherwood, and building a new 66” water line to carry Willamette River water to Beaverton, Aloha, and Hillsboro. The contractor is close to completing paving and sidewalk along the north side of the road; then traffic will be shifting onto the newly-constructed north side of the road for the contractor to work along the south side of the road. Construction is planned through 2025. 

More information is on the Washington County website at Tualatin-Sherwood Road (Langer Farms Parkway to Teton Avenue) | Washington County, OR (washingtoncountyor.gov)  and Road closure / traffic information at Road Closures & Traffic Advisories | WC-ROADS

Herman Road (Teton Ave to Tualatin Rd)

The contractor is planting landscaping and doing final cleanup work on Herman Road from Tualatin Road to Teton Avenue.

Reservoir and Pump Station at Aquifer Storage and Recovery (ASR) Site

A consultant is designing a new reservoir and pump station at the aquifer storage and recovery (ASR) site off 108th Ave in the Ibach neighborhood to provide additional water storage and service capacity for the southern part of Tualatin.

108th Avenue (Tualatin Rd to Leveton Dr)

A contractor for Lam Research is building frontage improvements along 108th Avenue in conjunction with development on the Lam Research site. Delays are possible during the day as flaggers guide traffic around the work zone.

Plambeck Gardens - Boones Ferry Rd south of Norwood Rd

A developer is constructing the Plambeck Gardens affordable housing complex on the east side of Boones Ferry Road south of Norwood Road and south of Horizon Church.  Much of the building is now complete with exterior and finish work in progress. 

Autumn Sunrise Subdivision (Boones Ferry Road and Norwood Road)

A developer is constructing the 400-lot Autumn Sunrise subdivision stretching from Norwood Road west of Interstate 5 to Boones Ferry Road between Norwood and Day Roads.  The first phase homes near Norwood Road are occupied, the second phase homes are being sold, construction is starting soon on the third phase nearest Boones Ferry Road, and streets are being paved for the fourth phase. 

 

The developer is constructing a traffic signal where the subdivision road meets Boones Ferry Road.  Signal poles are scheduled to be installed next week, followed by signal heads the week after, with the signal anticipated to be operational in late November.

124th Avenue at Myslony Street

A private developer is constructing a new traffic signal at the intersection of 124th Avenue with Myslony Street in conjunction with new buildings on Myslony Street.

Click to view older weekly project updates

 

 

Updated: 10/24/2024

 

To download a printable copy of previous project updates see attachments below.

Click any thumbnail image to view a slideshow

Sidewalk improvement
Crosswalk improvement
Sidewalk stamps
Road Construction