Weekly Project Update

Project Website
Weekly Project Update

Herman Road (Teton Ave to Tualatin Rd)

A contractor will be retrofitting curb ramps to meet ADA standards and repaving the Herman Road / Tualatin Road intersection and repaving Herman Road east of Teton Avenue in the next couple of weeks.  Expect flaggers and possible delays.  Paving will likely be the weekend of June 29-30.

Martinazzi Ave Sewer (Avery St to north of Sagert St)

Preliminary work (with flaggers) is scheduled on Martinazzi next week for construction planned to start in July on a new sewer main under Martinazzi Avenue from Seminole Trail (north of Avery Street) to north of Sagert Street.  Martinazzi Avenue will be closed from Sagert Street to Avery Street for sewer work this summer.

Boones Ferry Rd at Avery Street

The contractor has paved the new right turn lane for Eastbound traffic on Avery Street turning right to head south on Boones Ferry Road.  The new traffic signal controller is operational.  Roadway striping is scheduled Monday 6/17 (expect delays 8:30-4:00), with landscaping and cleanup scheduled later next week.

More information is at www.boonesferrycorridor.com

Teton Ave Rail Crossing (Between Avery and Tualatin-Sherwood Road)

A contractor for the railroad will be working on Teton Avenue at its railroad crossing (between Avery Street and Tualatin-Sherwood Road) Wednesday, June 19th from 9am to 3pm.  Traffic will be controlled by flaggers; expect delays.

108th Avenue (Tualatin Rd to Leveton Dr)

A contractor for Lam Research is building frontage improvements along 108th Avenue in conjunction with development on the Lam Research site. Delays are possible during the day as flaggers guide traffic around the work zone.

Tualatin- Sherwood Rd (from Teton Ave to Sherwood)

Washington County’s contractor is adding travel lanes and pathways along Tualatin-Sherwood Rd from Teton Ave west into Sherwood.  They are also building a new 66” water line to carry Willamette River water to Beaverton, Aloha, and Hillsboro. Traffic is now using the south side of the road, and the contractor is forming and pouring the sidewalk and driveway connections along the north side of the road. Construction is planned until 2025. 

More information is on the Washington County website at Tualatin-Sherwood Road (Langer Farms Parkway to Teton Avenue) | Washington County, OR (washingtoncountyor.gov)  and Road closure / traffic information at Road Closures & Traffic Advisories | WC-ROADS

Plambeck Gardens - Boones Ferry Rd south of Norwood Rd

A developer is constructing the Plambeck Gardens affordable housing complex on the east side of Boones Ferry Road south of Norwood Road and south of Horizon Church. 

Autumn Sunrise Subdivision (Boones Ferry Road and Norwood Road)

A developer is constructing the 400-lot Autumn Sunrise subdivision stretching from Norwood Road west of Interstate 5 to Boones Ferry Road between Norwood and Day Roads.  The first phase homes near Norwood Road are becoming occupied, the second phase of homes are under construction, and the developer is paving the roads for the third phase nearest Boones Ferry Road.

Reservoir and Pump Station at Aquifer Storage and Recovery (ASR) Site

Survey work starts in July for a new reservoir and pump station at the aquifer storage and recovery (ASR) site off 108th Ave in the Ibach neighborhood.  This will provide additional water storage and service capacity for the southern part of Tualatin.

Click to view older weekly project updates

 

 

Updated: 6/17/2024

 

To download a printable copy of previous project updates see attachments below.

Click any thumbnail image to view a slideshow

Sidewalk improvement
Crosswalk improvement
Sidewalk stamps
Road Construction